Általános szelektorok
Csak pontos egyezések
Keresés a címben
Keresés a tartalomban
Post Type Selectors
Kapcsolatba lépni

Modular Cleanroom - Stem Cell facility for Royal Marsden hospital as Principal Contractor

Enbloc were chosen as Principal Contractor to provide a new facility with modern and flexible cleanroom suites in a modular building at RMH Sutton. Enbloc provided Full design, construction and fit out to form new cleanroom laboratory suites together with Validation to achieve MHRA Licence.

The facility comprises: unclassified lobby and consumables store/quarantine area, separate Grade C personnel change rooms and materials airlock consisting of a common wiping-in area and separate in and out transfer hatches.

These lead into a common Grade C support area with ducted laminar airflow cabinets.  This area feeds into the two Grade B Cleanrooms with ducted laminar flow cabinets providing a Grade A work environment.

The facility is finished in a fully welded vinyl finish to walls, floors and ceiling including full built in benches to minimise hard-to-clean areas.

Hasonló létesítményt keres?

Lépjen kapcsolatba velünk:

+44 (0)1452 651850info@vanguardlifesciences.com

Kapcsolódó esettanulmányok

Vanguard Life Sciences
Unit 1144 Regent Court, The Square, Gloucester Business Park, Gloucester, GL3 4AD

crossmenu