As main contractor, Enbloc designed and built the project, culminating in MHRA certification being awarded, in a total of just 6 months from initial concept. This included installing 800m² of mezzanine floor allowing the facility to have a duplicate of the ground floor on the 1st floor. The client then has the flexibility they need to process multiple product lines at the same time.
The facility comprises 6 Grade B cleanrooms both recirculating and full extract all with their own dedicated change rooms. These Grade B rooms are supported by a further 4 Grade D cleanrooms and 4 primary change areas. There are large packing areas on each floor and a full-height temperature controlled pharmaceutical warehouse with goods lift.